Global Electrical Engineering

Foundation Installation for Process Equipment Expansion.

Overview

Global Electrical Engineering commissioned our team to install precision-engineered foundations to support new process equipment at their Clitheroe facility. The project was part of a strategic expansion and required seamless integration with ongoing operations, high accuracy, and strict safety compliance—all within a tight three-month schedule.

“This was a critical phase of our expansion, and the execution was flawless. The team’s professionalism, precision, and communication were second to none.”

Mark EllisSite Operations Manager

Global Electrical Engineering

Client: Global Electrical Engineering
Location: Clitheroe, Lancashire.
Project Duration: 3 Months
Completion Date: April 2025

Objectives

  • Install reinforced concrete foundations for heavy industrial equipment.
  • Achieve zero disruption to existing plant operations.
  • Ensure structural integrity under dynamic and static loads.
  • Coordinate with OEMs for precise anchor bolt placement.
  • Deliver the project safely and on time.

Challenges

  • Integration with existing plant foundations: The new foundation system had to be seamlessly incorporated into the existing structural layout, requiring careful planning and execution.
  • Temporary support systems: Multiple temporary supports were designed and installed to maintain the operation of critical infrastructure, including flue stacks, induced draft (ID) fans, and incoming crude gas ducting.
  • Live site constraints: All work was carried out within a fully operational industrial environment, demanding precise coordination and safety management.
  • Tight tolerances: Millimeter-level accuracy was required for embedded components to align with incoming equipment.

Solutions

  • Conducted detailed structural and site assessments to ensure compatibility with existing foundations.
  • Designed and installed bespoke temporary support systems to maintain full functionality of flue stacks, ID fans, and gas ducting throughout construction.
  • Used laser-guided surveying and custom formwork to achieve precision placement.
  • Maintained continuous communication with plant operations to coordinate activities and avoid interference.

Results

  • Zero disruption to plant operations throughout the project.
  • Project delivered on time.
  • Foundations completed with ±2mm tolerance.
  • Site handed over ahead of equipment delivery schedule.

Why Choose Us

  • Proven expertise in industrial foundation systems.
  • Precision-focused delivery under tight timelines.
  • Strong safety culture and environmental compliance.
  • Trusted by global leaders in manufacturing and materials